Bhutanese generally do
not save, they spend more than they earn. They even borrow to spend. So
national-debt-is-not-my-concern attitude of politicians, bureaucrats, private
individuals alike is not really shocking. Is there any other way, other than
hydropower, to service mounting Nu 120 billion credit that is on upward spiral? Which sectors have
potential to service $2.0 billion equivalent loan: agriculture,
manufacturing/industry and/or tourism? Credit, by itself, is not so much of a
concern, if the country has capacity to make the most of the loan and service
it. For us, it’s a huge “if”!
As per the Financial
Times, Japan is the most indebted nation in the world with gross debt to GDP
ratio of 245%. The figure is mind-boggling but the public still maintain calm.
The Japanese government holds large amount of assets, therefore the net debt to
GDP ratio goes down to 132%. And then Bank of Japan holds a large amount of
Japanese government bonds which, in principle, can be held forever without
having to worry about how it is going to repay. Then the net debt relative to
GDP ratio goes even further down to 80%. Some have calculated as low as 41%.
Looking at
our current standing on assets that can be beneficially traded/harnessed, we have no choice except to harness
our hydropower. It is already almost like staking the futures of our
children/grandchildren on hydropower. The arguments on “eggs in a basket” are
redundant. We can only talk about our ability to smartly harness hydropower and
move ahead securely. Yes, securely! Let us not make hydropower an issue for political gamble. Please, people of Bhutan and the region deserve better and we have to have high ability because the
hydropower, in my view, is a high risk investment. I do not buy “cost plus”
paradigm with the Government of India as risk covers, certainly not on account of the following.
First, can anyone
(including experts from both countries intensely involved in power sector) tell
us capacity factors of the Bhutanese run-of-the-river mega power plants down
the line, say in 10, 15, 20 years from now, considering water-flow variations,
seasonal as well as year to year, technological shortfall then and other human
factors? The way we import power at the moment from India in winter gives us
impression that the capacity factors of our power plants are low even now. The
capacity factor risks can be mitigated to an extent by optimizing the sizes and
types of hydropower plants. Why are we going ahead with mega run-of-the-river
power projects with high capacity factor risks? Isn’t smaller run-of-the-river
and reservoir power projects combination with high capacity factors the better
option? In terms of energy storage, power plant efficiency and energy security,
this combination is by far the better option. Shouldn’t capacity factor be one of the major considerations along with geotechnical, hydrological and environmental factors? What is the assurance that the
run-of-the-river mega power plants will not be redundant in say 10, 15, 20
years when we consider snow and glacier melt runoff by then?
Second, we need to
think ourselves as an open energy market player considering the regional (even global) power grid development. Then will our power be
competitive in an open energy market considering that the energy profile of the
world, including that of renewable energy in India, changes at a rapid pace? We better be aware of the open market forces in energy sector and prepare for the challenges. For instance, hydraulic fracturing (“fracking”)
and horizontal drilling seem to be breaking the power of the OPEC to keep the
oil price high. The brent crude is trading at $50/barrel from the high of
$145/barrel in August 2008. Goldman Sachs says $20/barrel in future is a
possibility.
Third, there are huge efforts
for paradigm shift in urban energy systems with
distributed energy generators, also called energy servers, producing
clean reliable, affordable electricity at site. Some even talk about grid
electricity as fading trend in the new energy world. Will our power plants
feeding the grids remain relevant through their economic life? Many power
systems claim they generate electricity cheaper than the power companies for
two main reasons. Firstly, their unmatched efficiency in converting fuel (e.g.
fuel cell) to electricity, meaning systems producing significantly more
electricity for the same fuel costs. Secondly, the ability to generate fuel at
site eliminates the need for costly transmission and distribution
infrastructure both physical and organizational. So much so that the savings
typically are calculated to provide a 3-5 year payback on the initial capital
investment on energy servers.
Fourth, we have to be
absolutely sure about our hydropower policy and strategy, and transform the
economic development pattern to resource, more specifically water-resource,
based model. This may involve massive reforms including redirecting investments
and entrepreneurs, and reforming, streamlining and cutting the civil service to size. The civil service needs to be free from
cronyism and corruption, and has to have strength to face, not hide, the reality on ground. Are we prepared to transform, cut and clean? The pseudo-fanaticism
piggy-backed on “cost plus” principle is bound to fall flat.
Fifth, key to above
lies on the abilities of our current and future workforce that need to be
highly educated and dynamic to take up the challenges posed by the massive
economic shift. There is no denying that the quality of our workforce is the weakest link in the development process. The IQ level of our school children are low (anyone can verify
this). Are we ready to reform education sector based on meritocracy as
fundamental ideology and principle in the education system? The education
system has to aim to identify and groom bright young students for positions of
leadership. Leadership in energy is not an easy option. Children need to be
taught manners, honesty, respect and responsibility. We may need to go beyond
to teach softer skills such as collaboration, critical thinking and creativity.
Critical factors for developing creativity in school include: (i) creating in
the classroom an environment that support creative thinking and work; and (ii)
teaching creativity skills and strategies explicitly and assessing in the
context of academic learning. Misplaced priorities in education do not produce
leaders of international level. Nationalism has its own place and should evolve
through deeper sense of respect, knowledge and substance, not through parroting
of catchphrases. The practices incubate superficiality, obliterates creativity,
and let go public interest.
"Thus, the hydropower program has lost a lot of its financial sheen... In other words, this sector, that is responsible for the huge debt, is also not creating the right kind of jobs..."
ReplyDeletehttp://www.eco-business.com/news/india-bhutan-hydropower-cooperation-fraying-at-the-edges/
A Study of India-Bhutan Energy Cooperation Agreements and the Implementation of Hydropower Projects in Bhutan by Vasudha Foundation
ReplyDeletehttp://www.vasudha-foundation.org/wp-content/uploads/Final-Bhutan-Report_30th-Mar-2016.pdf
Modi Lays Groundwork For Water War in Battle With Rival Pakistan
ReplyDelete"Kashmir is not about Kashmir," Vikram Sood, former chief of India’s foreign intelligence agency said. "It’s certainly not about the Kashmiri people. It’s about water."
http://www.bloomberg.com/news/articles/2016-10-18/modi-lays-groundwork-for-water-war-in-battle-with-rival-pakistan
Tariffs for world’s biggest solar power plant of 750 MW in Rewa, Madhya Pradesh hit all-time low of Rs2.97/unit (against average rate of Rs3.20 per unit for thermal)
ReplyDeletehttp://www.livemint.com/Industry/zW5Lf1okn054cFug5yKGsL/Madhya-Pradesh-solar-bids-hovering-at-Rs3-per-unit-in-revers.html
....."India’s power-surplus status and the advent of other renewable energies like wind and solar power will make it more difficult for Bhutan to ensure that its hydropower sector becomes profitable. And unless India finds ways to help, it will be accused of the same sort of “debt-trapping” that China is accused of today. India also needs to focus on policing cross-border trade better. The goods and services tax still hurts Bhutanese exporters, and demonetisation has left lasting scars on the banking system..."
ReplyDeletehttps://www.thehindu.com/opinion/op-ed/sovereignty-and-sensitivity/article24731900.ece
"Any electricity trading licensee of India may, after obtaining approval from the Designated Authority, trade in the Indian Power Exchanges on behalf of any Participating Entity of neighbouring country, for the specified quantum as provided in the approval subject to compliance with the applicable Regulations of the Commission,” CERC said in a notification on the regulations.
ReplyDeletehttps://energy.economictimes.indiatimes.com/news/power/cerc-notifies-cross-border-power-trade-regulations/68485529
Spy satellites reveal extent of Himalayan glacier loss
ReplyDelete"... The Columbia University team looked at 650 glaciers in the Himalayas spanning 2,000km.
The group found that between 1975 and 2000, an average of 4bn tonnes of ice was being lost each year.
But between 2000 and 2016, the glaciers melted approximately twice as fast - losing about 8bn tonnes of ice each year on average....."
https://www.bbc.com/news/science-environment-48696023
Nepal, Bangladesh to use Indian grid for power trade
ReplyDelete"Amid talks of Nepal-Bangladesh dedicated transmission line passing through the Siliguri corridor in India, the secretary level meeting between energy officials of both countries agreed to use the existing setup of Indian transmission lines to trade power in the short run...."
https://kathmandupost.ekantipur.com/news/2019-06-23/nepal-bangladesh-to-use-indian-grid-for-power-trade.html
Now three small hydropower projects with a total generation capacity of 104 MW at Lhuentse, Zhemgang and Haa are in the program, which I think is the way to go.
ReplyDeleteBut will the approach, without substantial pursuance of other 4 issues, suffice while debt piles up to Nu 250 billion equivalent (Nu 150 billion then)?
https://kuenselonline.com/bhutan-embarks-on-small-hydropower-projects-for-energy-security/